The Six O’Clock Figure
The scheme posted the pond level in our shop window. Mr Rennie took Cairnwater shares for the back paddocks, and by long agreement the office phoned the figure through at six, and Dave wrote it on the card in white pencil, and that was most of the news in Bellhaven, along with the works doppler and whether the shuttle was running.
I was seventeen and driving the van for the summer. Feed, drench, dog biscuits, the odd gate part, out onto Harker Flats before the heat came up. If I did the flats run clean till February — no wrong drops, no credit arguments — Mr Rennie had said I could have it on my own licence.
The rule came with the run. Dave gave it to me the first morning, along with the keys.
“Card goes up at six. Water’s a different matter.” He tapped the glass. “If you’re out on the flats and the water’s over the third stump — the grey ones below the old ferry — and the card still says yesterday’s figure, you don’t stand there sorting out which of them’s wrong. You get up the levee. Take whoever’s with you.”
I asked who’d proved it. Everybody, he said, in the way everybody proves a rule: somebody’s uncle. His uncle Bob had been gauge man out there thirty years, up till ’94, and Bob’s version had the incident in it. February of ’78. Gauge man down with his back, the office running the book figure for a week, and the flush came down through the fog with nobody at the intake to sound the siren — the siren worked off the gate telemetry, and the telemetry worked off what the book said the pond was holding. It took the second cut where it lay, and a quad bike, and forty of Aldous Martyn’s ewes off the point. The file at the county, Dave said, called it gauge within tolerance.
Friend-of-a-friend shape, sure. But it came with a place and a time and a thing to do, which is more than most warnings get.
The Stump Line
January was dry. The pond should have been walking down the card a finger at a time, and the card said it was: 43.0, 42.6, 42.1, days in order like fence posts.
The water said otherwise. The stump line runs out from the gate at Corcoran’s — six grey posts, ferry moorings from before the dam, marching across the shallows — and by the third week of January the second stump was wearing water at the knee. The card said 42.1. Forty-two-one puts the water at the first stump’s ankle.
I started keeping the run book differently. Stump column, card column. Then the numbers ran out of stumps and I added the fence wires.
End of January the third stump went under on a morning the card said 41.8. I stopped the van in the gravel and counted to a hundred, waiting for the arithmetic to fix itself. Fog on the water. The far stopbank gone grey. The pond standing higher than any number in that window had ever put it.
The New Gauge
I did what you do. Phoned the office, then drove out.
Mr Hart at the counter was decent about it. He had me write my figures down and laid the stilling-well tape alongside, a long waxed strip with the pen trace walking it like a seam. The tape agreed with the card to the decimal. Forty-one-eight. I asked whether the well could be reading wrong — silted, maybe, sitting in its own calm pocket away from the pond. He said the well was the instrument, and the instrument was what they had.
Two weeks later two scheme men spent a day at the reservoir with a spray rig and a grinder. They didn’t go near the well. They painted the staff gauge — the timber one standing in the shallows by the tower — fresh white figures, every mark a foot lower than the mark under it had been, and there was a notice in our window when I got back.
NOTICE TO SHAREHOLDERS — CAIRNWATER GAUGE DATUM.
Investigation has established that the reservoir staff gauge was mis-set at installation. A corrected datum applies from 1 February. Historic readings have been adjusted on file. Current storage is within normal range.
The stumps came out the same week. A heifer had broken a leg between them, went the word at the works, and the digger pulled all six mooring posts and stacked them by Corcoran’s gate for burning. A century of ferry posts. The true gauge, Bob would have called it, waiting on a match.
I sent my run book to the county — photocopied the stump column myself, both pages. The reply came to the shop, marked for my attention.
Thank you for your observations of 30 January. Non-instrumental observations cannot be entered against scheme records. The corrected gauge datum is authoritative.
The book came back with a paperclip through the pages.
That was a Thursday. On the Friday I went out early with a tin of white paint and did a quiet thing: marked two of the fence wires on the flats run, the ones that go under first. Second wire under, drive for the levee, spend nothing on the card. The rule hadn’t died. It had moved house.
Second Cut
The flush is a calendar item, second week of February, drawdown for the contractors. The card that week read 41.2 — pond at half, room to move, nothing for anyone below the dam to lose sleep over.
Ten past six I was on the flats with the windows down, fog sitting lowest, coldest air running into the van to keep me honest. Col Houghton’s camp sat by the race: tent, trailer, dog on a chain, fencing gear strung along the posts for the new line. I was dropping his drench at the gate.
Water over the second wire. Both sides of the crown of the road, no wind on it, and it came up the gravel with that flat sound water makes when it isn’t in a hurry.
I looked at nothing else. Levee road, foot down, horn held the length of Corcoran’s frontage, and I stopped in Col’s camp with the headlights through the fog. He came out swearing at the hour until he stopped mid-word. The dog was already at the end of its chain, pointed at the race. The race ran bank-full and climbing — and the race is where the flush arrives when the pond is being dropped faster than the book knows. His trailer was axle-deep before we got it shifted, and then we stood on the levee together and the flats filled like a bath. Quiet as anything. Second cut and all.
No siren. The siren would have come off the intake telemetry, and the telemetry said 41.2.
Col’s claim went in and came back settled under adverse weather, which is the drawer they file things in when the instrument can’t be wrong. The scheme’s incident sheet recorded a release within design parameters and put the ponding below down to blocked drains. Design parameters. The pond had stood two feet over the old numbers, and the old numbers were gone — paint over the cuts, stumps out at Corcoran’s gate, my stump column reclassified as weather in a teenager’s exercise book.
Mr Rennie gave me the flats run early that fortnight, on my own licence. I’ve had it since. The card still goes up in the window at six; one morning this month 41.2 went up and stayed a week, and I read the wires instead, both runs, every day.
A boy from the coast started Saturdays, stacking shelves. He asked about the stump line — you can still make out six holes in the turf at Corcoran’s when the growth is short, and that is the whole of the ferry now. I gave him the rule the way it came to me, with the wires in it.
He wrote it on the card. In white pencil, under the figure.
