The Second Roundabout
The bridge works went up in the third week I was there: grey hoarding, a temp traffic light on legs, and a closure notice laminated at both ends of Marchford bridge. NIGHT CLOSURES, 22:00–05:00, SIX WEEKS. DIVERSION SIGNED.
Brian read the notice over my shoulder at afternoon shift change and took me for a coffee I didn’t want.
“You’ll be on nights when they start,” he said. “So you get the talk now, instead of after.”
The talk was this. The amber signs — the diamonds on the yellow ground — you follow them as far as the second roundabout, the one with the garden centre. Then you leave them. Your own way, whatever it costs you in minutes.
“Past the garden centre they keep going,” he said. “Up past the gate at Sudmoor, arrows pointing over the moor. You do not go up there.”
“Why? What’s up there?”
“The Link.” He said it the way you give a road its local name, no ceremony. “Nineteen hundred metres of road the county’s got on its books and nobody’s ever built. There’s a gate, there’s a footpath, there’s four hundred metres of old sub-base that runs out into a field of barley. And there’s a making-up order from 1976 with a seal on it. The street went on the List before the scheme died at inquiry, and it comes off the List with an order nobody’s been paid to make since Heath was in office. So far as the county’s concerned, that’s a highway. Seven point three metres wide. Street-lit.”
He’d had it from the old lad with the pallet round before him, who’d had it from a county man over a fence in about 1988. That’s how the talk goes. Nobody who gives you the talk is the person it happened to.
“Rule three,” Brian said. “If you’re ever on it — and you won’t be — you keep rolling. You do not stop. You do not get out. Not for a puncture, not for a lamb, not for a man waving you down. Traffic keeps the road. Anything else is a person stood on a scarp in the dark, and then you’re not traffic.”
Twenty-Two to Five
First night of the closures I did as I was told. My own way from the second roundabout: ring road, the levels, the back of the retail park. Forty-one minutes extra. My last drop cleared at 06:04, four minutes past the cut-off, and the agency’s transport manager got the automated email about it before I’d parked the van.
One more, lads. Third one ends the placement. The depot group chat, no question mark.
The night after, the motorway shut two junctions up — a jackknifed artic, they said — and the whole town tried to use my own way at once. I sat in a queue of strangers’ brake lights on the ring road and watched the amber signs continue past the garden centre, on up past the gate, over the moor.
Six minutes. Brian had said six minutes, estate to Ashgate roundabout, and by any road with tarmac on it the same run is nineteen.
The queue moved a van-length. The clock said 02:51, the last drop was unmade, and I turned up the Link.
The Sudmoor Link
The gate was open. I want that written plainly: the gate at the foot of the scarp, padlocked every time I’d ever passed it on the bridleway, stood chained back on its post, and a fresh amber diamond above it pointed the way a diversion arrow points.
The sub-base lasted the four hundred metres it lasts on foot. Then the signs kept coming and the road kept being there.
It drove like new asphalt, and that is not a figure of speech. No camber wrong, no pothole, the wheel singing the way it sings on a dressed surface three weeks after the plant has been through. It had rained since ten o’clock and every road in the county wore a sheet of standing water. The Link was dry. Bone dry, swept, two polished grooves running up the nearside lane like the wear you get off a bus route.
Cat’s-eyes, spaced the way the manual spaces them. Lamps at the proper interval, every one dark, each with a small steel plate at eye height: SUDMOOR LINK 41. SUDMOOR LINK 42. A hedge on my side, cut square, and past it the gorse ran down the scarp into nothing — no lights, no farm, the town fallen away behind — and the road went on being a road, white edge lines and all, wherever the record said it was one.
The radio, empty all week after midnight, found the county’s own traffic channel and read the closure order on a loop, in the soft voice they put on recorded lines:
Marchford bridge, night works, closed twenty-two hundred to oh-five hundred. Local diversion in operation via the B-road and the Sudmoor Link.
A sign went by on my left, facing the other way, for traffic coming up the Link as I was: ROAD CLOSED AHEAD. There was no junction. There was nowhere it could have come from.
At the white stake marked PP3 there was a van.
County highways. The orange livery gone chalky, the beacon dome crazed and dead on the roof. Moss to the sills and up over the scuttle, the windscreen opaque green, the asset number on the door still reading — and the service sticker in the corner of the glass was this spring’s. Inspected. Due again in March.
I did not stop. The van was doing what the county’s books said it did, which was stand at passing place 3 in service, and I was doing what the order said I did, which was proceed.
Six minutes, estate to Ashgate roundabout, and the amber signs folded me down onto real tarmac with the rain waiting on it as if I’d been let out of a building.
Average Journey Time
The run cleared at 05:36. The telematics uploaded itself at the gate, the way it does, and by afternoon the transport manager had sent the depot a message with a thumbs-up in it: good find, that Link’s six minutes off the estate leg.
A fortnight later the routing app started offering it. Between ten at night and five in the morning, the Link comes up on every run to the Ashgate side. Fastest route. Average journey time six minutes, based on recent drives. My drive. I’m the recent drives.
The agency lads go up it now. One of them complained at shift change about a parked van he’d had to swerve round, up by the third passing place, and was told to log it as a highway obstruction. He logged it. The app still routes him up there.
I’ve been up it four times since. You take the six minutes off your own risk or you don’t, but you know the rule before you choose, because I’m the one who gives the talk now.
And once — the fourth time, a Tuesday, 02:14 on the clock — there was a vehicle ahead of me on the Link, holding the lane at thirty. Orange livery, chalky in my headlights. It signalled left at the white stake, PP3, and eased in to let me pass, the way you do for faster traffic on a single-lane section. Going by, I had the cab dark under the moss on the glass and the current sticker in the corner.
It pulled out behind me. In the mirror it stayed with me, patient, at the lawful following distance, all the way to the roundabout — and the roundabout was rain and brake lights and a Tesco lorry, and behind me the Link was a gate and a footpath and a field of barley.
I keep rolling. That’s the whole of the talk. There’s a new lad starting Monday on nights, the bridge works have six weeks to run, and I’ve already asked him for a coffee he won’t want.
